
Platinum Catalytic Plant
CompletedA 1 MW solar installation at a platinum catalytic converter manufacturing plant, designed around an energy arbitrage strategy that maximises self-consumption during peak tariff periods. The system integrates with the plant SCADA for load-aware dispatch and reduces grid dependence during the most expensive hours of the utility tariff schedule.
Scope of Work
- — Grid-tied PV
- — Energy arbitrage control system
- — Load management
- — SCADA integration
Delivered in partnership with our network.
Interested in a similar project?
Get in Touch